
Left Middle/Outer 120 Foot Boom Lubrication Point Line Detail
Mount valve bracket to Boom using existing clamp
bolt. Center the valve between
Install #20026 into Inner and Outer Pivot ports
and a #20028 45 degree adapter into the #20026,
followed by a #223-12273-6 into the #20028 and
connect line from outlet 5 to the Outer Pivot and
line from outlet 6 to the Inner Pivot Port.
Install #20024 into Inner and Outer Center
Leverage Ports and #223-12273-6 into the
#20024. And connect line from outlet 3 to the
Outer Leverage and the line from outlet 4 to the
Inner Leverage.
Route line through the center opening and secure
to the rib with a zip tie to assure no rubbing will
take place.
Continue routing around the radius of the pivot
leaving some slack for folding.
Route lines with existing hoses across the fold
and back to the valve.
Comentários a estes Manuais