Crossport Systems Pivio Manual de Instruções Página 25

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 24
Left and Right Middle/Outer 120 Foot Boom Secondary Valve Assembly and
Feed Line Detail
Important: Valve schematic above is set-up to lubricate the Lower Pivot Pins
which require repositioning of the lube ports (see below). If the lower pivot points
are not hooked up to the system, remove outlet fittings and install plugs in ports 3
and 4. Route lines from ports 1 and 2 to the Center Leverage Ports.
Do not plug valve outlet ports 1 or 2.
This will lock up the entire system.
20024
20026 20028 226-12273-6
223-12273-6
Outer Upper Pivot, 8M
Outer Center Leverage Pivot, 8M
Outer Lower Pivot, 8M
Inner upper Pivot, 4M
Inner Cente r Leverage Pivot, 4M
Inner Lower Pivot, 4M
226-14091-2
276407
Left Middle/Outer Boom
504-36041-2
619-27122-1
242125 Grease
Fitting Cover
700506
Grease Fitting
Vista de página 24
1 2 ... 20 21 22 23 24 25 26 27 28 29 30 ... 44 45

Comentários a estes Manuais

Sem comentários